hacking works started. gone are the mosiacs, roundish corners, dirty kitchen and toilets!
the foyer look so much brighter and opened now.
toilets hacked! build-in wardrobes teared down!
balcony door down, tiles hacked!
bags of sand = my $$
sand very expensive nowadays u know!
Finalised our lighting points too. Every point is $$. At first the contractor suggested like near to 10 points in the living and dining just for downlights. In the end we brought it down to the following:
- 4 downlights, 2 T5 and 1 fan point for living
- 4 T5 and 1 centre light for dining
- 2 downlights for corridor
- 2 downlight for MBR L-box
- 1 downlight for foyer.
- 1 centre light for balcony
- 2 centre light for kitchen
- 1 centre light for each bedroom
- 1 centre light for each toilet
$$$$$$$$$!!! still need to buy lights and toilet fittings!